INTRODUCTION 

The Zapata subdivision has been planned as an attractive, well-maintained place to live.  The covenants of Zapata provided for an architectural review process to maintain the standards and property values of the community and to encourage the protection of the natural environment. 

DECLARATION OF COVENANTS 

The Declaration of Covenants, Conditions and Restrictions for Zapata (Declaration) – legal documents dated August 8, 1975, and March 11, 1981, and recorded on the land records of Alamosa County Clerk and Recorder, Alamosa, Colorado – governs and protects the properties within the jurisdiction of Zapata Home Owners Association (Association).  The Declaration was adopted primarily to preserve property values within Zapata.  The Declaration is binding on all property within Zapata and “runs with the land” by operation of law. 

APPLICATION OF THESE RESIDENTIAL REQUIREMENTS AND GUIDELINES 

These requirements and guidelines are in addition to, and may be more restrictive than, the existing covenants and apply to all residential building sites within the Zapata Subdivision. 

PURPOSE OF ARCHTECTURAL REVIEW 

All new, remodeled and renovated residential projects will require architectural review.  The Zapata residential Architectural Design Requirements and Guidelines list Zapata’s design goals and provide specific direction as to site and building design.  A review of these documents will help you understand our community’s architectural design expectations.  We have included most of the requirements listed in both the 1975 and 1981 covenants; however, it is the responsibility of the homeowner or builder to be aware of, and abide by, the applicable covenants in addition to this document. 

ARCHITECTURAL COMMITTEE 

The Declaration establishes an Architectural Committee (AC), a committee that is appointed by, and reports directly to, the board of directors.  The AC interprets, administers and enforces the provisions of the Declaration through these Guidelines.  The AC consists of the following:

  •  
    • Director
    • Committee members

 

PROJECT REQUESTS 

No structures other than detached single-family dwellings, a maximum 3-car garage, guesthouse, servants’ quarters, and other outbuildings incidental to residential use of the property are allowed.  No improvements, alterations, repairs, excavations or other work, which in any way alters the exterior appearance of any property within Zapata, shall be made or done without the prior written approval of the Architectural Committee.  Approval is not required for repairs as long as they do not affect any of the architectural requirements or guidelines.   

Each request must be submitted in writing to the AC for approval prior to beginning any work.  An AC request form is available at the Association’s office.  The AC considers requests individually within thirty (30) days of the receipt of the submission by the AC. 

Any request submitted for a property with delinquent dues, assessments or fines will be denied approval. 

The AC will consider any possible influence on surrounding properties and will concentrate on maintaining the harmony established in the subdivision. 

Requests must comply with the applicable federal, state, county and local building codes and laws. 

Approvals do not indicate a review of, or comment upon, the structural soundness, safety or compliance with any government standards and regulations. The property owner is responsible for obtaining any necessary building permits, variances, exceptions, inspections, or other governmental approvals before starting any construction. 

Please select one of the forms below, which is appropriate to the construction you are considering. 

APPLICATIONS:

  1. You must submit a full building application  (Form A), attachments and fees for new construction to include dwellings, carports, garages, servants’ quarters, guesthouses and outbuildings and remodeling or reconstruction, wells, driveways, septic and leach fields, and power.
  2. You must submit a site improvement application (Form B), attachments and fees for driveway, well, septic and leach field, and power lines.  (This form is a pre-structure construction application and is valid for a 5-year period).
  3. You must submit a structure improvement application (Form C) and attachments for carports, garages, outbuildings, fences or walls.  (To use this application you must have a habitable dwelling on the building site).
  4. You must submit a variance application (Form D) and attachments for any variances.
  5. You must submit an easy form application (Form E) for small projects not covered by the above-listed applications.

 

Note:  Any habitable dwelling to include single-family dwellings falls under the Form A classification. 

Send all applications and plans to:

Zapata Homeowners Association

PO Box 1282

Alamosa, CO  81101

Phone: 719-589-6770

Email:  quiltlady1@q.com 

FEES

      Form A – New construction -- $250

      Form B -- $250 (5-year period)

      Form C – No fee

      Form D – No fee

      Form E – No fee

      Site re-inspection fee -- $50 

FINES 

No work may begin on a building site within Zapata without approval by the Architectural Committee and board of directors.  A find of $1,000 will be assessed for any violation of the covenants or these requirements and guidelines regarding commencement of construction, grading or excavation, wells, septic and leach fields and live tree removal.  No approval of applications or building permits will be allowed without payment of the fine. 

PROJECT COMPLETIONS 

No construction shall commence until a building permit for said construction has been obtained from the local governing body having jurisdiction.  Approved projects must be completed with 24 months from the date of commencement of such construction.  The AC may consider a written request for extension of the time limit. 

VIOLATIONS 

Architectural violations are received and processed through the AC.  The standard procedure for processing these violations consists of staff verifying the problem.  Action is then initiated through a two-letter notification procedure.  A first letter is sent to the owner with notice of the violation.  A resolution of this matter should be made within 15 days. 

If no response is received and the violation remains unresolved, the matter will be forwarded to the ZHA Board of Directors and the Association’s legal counsel for attention.  A letter from the Board and Counsel will then be forwarded to the owner addressing the failure to correct the violation and also indicates non-compliance with the Architectural Guidelines or Covenants.  Finally, if no resolution has been reached within 15 days, the Association may be forced to seek injunctive or other suitable legal relief through legal means.  Also, the Association will seek reimbursement of all legal fees incurred.

Section II

 

INTRODUCTION 

The following requirements and guidelines are provided for assistance in planning projects and submitted requests and are a combination of the 1975 and 1981 covenants and additional requirements.  The AC reserves the right to turn down applications that do not meet the covenants or requirements and guidelines.  Likewise, the AC reserves the right to approve projects that vary from the requirements and guidelines.  The lack of specific information in the guidelines does not preclude the AC from approving or denying any specific project. 

STANDARDS OF REVIEW 

Zapata’s goal is to promote a high quality of design and for each project to be in harmony with its natural and manmade settings.  Alteration of natural landforms and plant communities should be minimized; preservation of existing trees and shrubs is given high priority.  Zapata is not attempting to enforce one uniform architectural style.  A project may be harmonious with existing buildings without repeating a single architectural style; a compatible diversity of styles is welcome. 

The following are encouraged:

  • Designs which take advantage of, rather than altering, natural landforms;
  • Designs that reinforce Zapata’s semi-rural, residential, low profile character;
  • Earth-toned, subdued colors;
  • Textured, natural-appearing exterior materials and finishes

 

Not acceptable:

  • Massive grading;
  • Long, blank walls;
  • Reflective, shiny surfaces;
  • Bright or neon colors

 

ARCHITECTURAL REVIEW PROCESS 

  1. Submit application, fees and architectural working drawings to ZHA office
  2. Plan review by AC
  3. Review by AC of site plan staking
  4. Letter to county on approval
  5. Final site inspection

 

APPLICATION 

Any improvements on lots or tracts within the Zapata Subdivision require a building application and its submission for review to the AC.  The AC will have 30 days to review plans and to reply to the applicant.  The postmark from the ZHA office to the AC determines the beginning of the 30-day period.  For new construction, remodeling and additions, architectural drawings consisting of floor plans, elevations, color and finish, plot and site development plans, and other documentation will be required.  (See attached forms and samples). 

SITE PLANNING 

It is strongly advised that you have your property surveyed professionally.  Site inspections require a certified survey or the steel site pins located. 

  • Maximum disturbed lot surface shall be 30%, including excavations, buildings, driveways and parking.
  • Minimum lot size – 1 acre
  • Minimum setbacks for all buildings from property lines, as measured perpendicular to the property line:
  • Front – 30’ (feet)
  • Side Street – 30’ (feet)
  • Side – 15’ (feet)
  • Rear – 30’ (feet)
  • Habitable buildings on the same building site, such as guesthouses or servants’ quarters, must be a minimum of 20’(feet) from existing habitable buildings
  • All structures must be a minimum of 25’ (feet) from any creek or identified waterway
  • Septic tanks and leach fields must be at least 50’ (feet) from lakes, active or seasonal watercourses and 100’ (feet) from on-site wells and any adjacent wells.
  • Utility easements are 5’ (feet) on the side and 10’ (feet) from the street or front.
  • All site work shall take into account the natural drainage patterns on the lot and adjoining lots.

Parking areas: 

  • Vehicles shall be parked only in designated parking areas, private drives or garages.
  • No construction vehicles shall be parked on any public streets. 
  • All drives and parking shall be graded for proper drainage.

 

MINIMUM AND MAXIMUM ALLOWED FOOTAGES FOR STRUCTURES AND BUILDINGS 

Per building site:  One (1) detached single-family residence with a minimum square footage of 950 sq. ft. for one story or 1,200 sq. ft. for one and one-half, two, or two and one-half stories.  Square footage is determined as interior living space as measured to the outside wall face, including lofts that have a height of 5’ (feet) or more enclosed in one building or unit. 

Maximum additional structures per building site:

  • One (1) attached or detached garage – maximum 3-car and maximum 900 sq. ft., 24’ (feet) maximum height
  • One (1) outbuilding maximum 900 sq. ft., 24’ (feet) maximum height
  • Two (2) sheds maximum 10’ x 12’ or 120 sq. ft., 16’ (feet) maximum height. (No foundation is required by Alamosa County for such structures under 10’ x 12’).

 

All residential and habitable structures shall be built on a continuously poured concrete foundation.  Other alternative foundation construction may be approved.  No residential or habitable structure shall be on blocks, jacks, loose blocks or other temporary foundations.  No RV, trailer, basement, tent, shack, garage, barn, or other building other than residential homes, guesthouses or servants’ quarters erected on a building site shall at any time be used for temporary or permanent human habitation.

 

Your browser may not support display of this image.

EXTERIOR MATERIALS 

Walls:  Suggested exterior wall materials are natural wood, embossed fiberboard siding, natural or cast stone, and/or stucco.  Other siding materials may be approved on an individual basis.  Recommended colors are natural color ranges to be determined by the AC.  The AC, on an individual basis, will review alternative building methods and materials. 

Roofs:  All roof materials are limited to painted metal, clay or artificial tiles, slate and asphalt-composite shingles.  Cedar shingles or shakes are not permitted because of fire danger. 

EXTERIOR LIGHTING 

Indirect lighting, downward directed lighting; hooded fixtures and low voltage walkway lighting are allowed exterior light sources. 

No exterior lights from which the direct source is visible or that produces excessive light pollution shall be allowed. 

No pole-mounted security lighting will be allowed. 

ANTENNAS 

VHS/UHF/RADIO antennas shall be mounted on a single pole and will be six feet or less in height from the peak of the roof.  Antennas will be moderate and unobtrusive in size.  The general appearance of antennas will be similar to standard television antennas.  Tower structure antennas will not be approved.  Satellite dish antennas under 24” (inches) diameter are approved.  Dishes over 24” (inches) in diameter will be considered based on size, location and method of installation and screening.  No owner or operator of electronic equipment may erect a receiving and sending mast and antenna without prior written approval.  No equipment generating electromagnetic energy that may interfere with communication reception will be permitted. 

REFUSE STORAGE 

Trash containers/dumpsters will be stored enclosed or out of sight.  Outdoor containers must be bear-proof design and must be screened by an approved fence or enclosure.  No burning of refuse or trash is permitted. 

By the ZHA Board of Directors

Adopted May 15, 2009 

Architectural Requirements and Guidelines for Zapata Residential Sites

and

Architectural Requirements and Guidelines for Zapata Subdivision Commercial Sites 

ENERGY-SAVING DEVICES

For public health, safety, acceptable noise levels and aesthetic reasons, the dimensions, placement, and external appearance of an “energy-saving device” shall be subject to Architectural Committee review.

  • Solar panels for electricity production (PV panels), solar panels for heating domestic hot water (DMH panels), solar panels for entire home heating, and wind generators for generating electricity, and yet unknown new technologies that become generally accepted are the “energy-saving devices” covered by this document.
  • The highest point of a solar panel will be less than the ridge of the roof to which it is attached. unless this location significantly increases the cost of the device or significantly decreases its performance or efficiency. Piping and electrical connections will be located directly under, and within, the perimeter of the panel.
  • Pipes or cables connecting the solar panel with storage media such as battery banks for PV and a water tank for thermal systems are usually connecting at the roof mounted collector with lower (in-ground or on-the-ground) storage medium.  While directing such pipes/cables down through the attic may have some aesthetic appeal, it could serve as an impediment to a system that is being retrofitted to an existing house.  Therefore an external connection between the solar collector and the storage medium will be allowed, based on color and pattern matching the outside wall of a structure. 
  • Detached panels, standalone solar tracking PV panels or thermal hot water heating systems which that cannot be mounted on the roof of a home due to weight (with the exception of simple domestic hot water systems) shall be reviewed by the Architectural Committee on an individual basis.  The solar collection area of water heating panels, sufficient to heat the average home in Zapata, dictates 5 to 10 collectors of size 8 feet by 4 feet.  Such collection arrays must have the following characteristics
  •  
    • They must not reflect light onto a neighbor’s property.
    • They must not block the view from a neighbor’s property
    • They must observe existing set back rules from property boundaries
  • Abandoned or deactivated devices shall be removed at property owners expense. 

Wind-electric generators are allowed, provided reasonable steps are taken to reduce the sound associated with them, so as to reduce interference with the use and enjoyment by residents of property situated near the wind-electric generator.

  • Audible Noise due to Wind Energy Facility or Wind Turbine operations shall not exceed the lesser of  five (5) decibels (dBA) increase over the existing background noise level (L90) or exceed forty (40) decibels (dBA) for any period of time, when measured at any structure used as a residence.
  •  
    • All measurements shall be taken using procedures meeting American National Standard Institute Standards including ANSI S12.18-1994 (R 2004) American National Standard Procedures for Outdoor Measurement of Sound Pressure Level, and (ANSI) S12.9-Parts 1-5
  •  
  • Notification of, and cooperation with, the ZHA board shall be required for the installation of a  residential wind energy system.
  • All wiring between wind turbines and the wind energy system substation or electrical line hook up shall be underground.
  • Wind turbine towers shall not be climbable. In some cases a fence may be required for safety around the wind turbine.
  • The building permit application shall be accompanied by wind system specifications, including, decibel level, manufacturer and model, tower drawings, rotor diameter, total tower height, hub height, tower type (freestanding or guyed). Owner is responsible for verification of decibel measurements.
  • A wind turbine shall be set back from the nearest property line, public road, above-ground electric power or telephone line a distance no less than 1.1 times its total height or existing set back rules, whichever is greater.
  • The Ste Plan accompanying the building permit application shall include the following:
  •  
    • Location of the proposed wind system tower
    • Point of tie-in to any existing utility lines
    • Shadow Flicker area
  • Abandoned or deactivated devices shall be removed at property owner’s expense. 

DEFINITION OF TERMS:

  • Owner/Operator: The person or entity responsible for the day-to-day operation and maintenance of a wind turbine or wind energy facility.
  • Personal Wind Turbine: A wind energy conversion system which that converts wind energy into electricity through the use of a wind driven turbine generator when the total height is 150 feet or less.
  • Hub Height: The distance measured from ground level to the center of the turbine hub.
  • Rotor Diameter: The total diameter of the wind turbine blades.
  • Total Height: The distance measured from ground level to the blade of a wind turbine extended at its highest point.
  • Shadow Flicker: The moving shadows or shaded areas that are cast by rotating turbine blades.
  • Wind Energy Facility Siting Permit or Wind Turbine Permit: A construction and operating permit granted in accordance with the provisions of this rule.
  • Excessive Noise – see “audible noise” guidelines.

 

FENCING 

No fence, wall, hedge, or mass planting shall be permitted to extend beyond the minimum building setback line except decorative wood fencing less than 3 feet in height and 3- to 3-strand wire fencing with wood or metal posts. 

Split rail, natural wood, natural or cast stone, stucco and other wire fences may be approved based on an individual property owner’s needs. 

Barbed-wire fences are prohibited. 

LANDSCAPING 

No substantial change shall be made in the elevation of any portion of the building site.  Respect the natural drainage patterns of the land.  By Colorado water law, in no case may active water drainages be blocked, dammed, or diverted.  Due to the high desert zone of the Zapata area and lack of water supply, it is advised that all landscaping should take advantage of native trees, shrubs and plants.  Residential well permits do not allow for lawn sprinklers or irrigation. 

OUTSIDE STORAGE 

The open storage of a motor home or travel trailer, either with or without wheels, on any parcel of property is prohibited.  A motor home, trailer, motorboat, houseboat, or similar water-borne vehicle may be maintained, stored, or kept on any parcel if housed completely within a structure that has been approved as an outbuilding.  Any outside storage areas must be shielded from public view by approved fences. 

TANKS AND FUEL STORAGE 

Propane and/or heating oil tanks approved and installed to government regulations are permitted.  No other above ground fuel storage tanks or hazardous chemical storage will be allowed. 

DECKS 

Any deck that is over 30” (inches) in height from grade requires a building permit. 

SIGNS 

Permission is granted for one (1) for sale or for rent sign, which shall be no more than 4 square feet in size on any one property within the Zapata subdivision.  Signs showing the address or identifying a property that fit within the 4 square foot maximum size restriction are encouraged for emergency services locating.  No other signs such as, advertisements, billboards, or advertising structures of any kind may be erected or maintained on any lot. 

ADDRESS SIGNS 

Signs showing the address or identifying a property that fit within the 6 square foot maximum size restriction are required for emergency services locating. The address numbers must be at least 6" in height and must be clearly visible from the road. These signs must be permanent and must be in place prior to the commencement of construction. 

DRIVES 

The directing of drainage down driveways or paths and onto public roadways is prohibited. 

ANIMALS AND HORSES 

No animals other than house pets shall be kept or maintained on any property, except that no more than two (2) horses may be kept or maintained on contiguous parcels of 5 acres or more. 

ELECTRIC 

ZHA prefers that all power lines be buried. 

WELLS, SEPTIC AND LEACH FIELDS 

All residences are required to have an on-site well water system and septic/leach field as regulated by the state and local governing bodies.  Applicants for new construction must indicate the proposed method for disposing of human waste on site prior to the connection of permanent toilet facilities.  No pit toilets or outhouses are allowed.  Cisterns may be approved for fire mitigation. 

ABANDONED, DESTROYED OR REMOVED BUILDINGS 

Any building project where no visible progress has been made after the 24-month time limit (plus any extensions granted) has elapsed may be required to be removed and the site restored at the owner’s expense.  Homes destroyed by natural causes must be rebuilt or all debris removed and the lot restored to a sightly condition within 120 days.  Removal or demolishing an existing building requires AC approval. 

LOT CONSOLIDATIONS 

Consolidation of lots is encouraged.  Contiguous lots may be consolidated pursuant to Alamosa County procedures and regulations.  Once lots have been consolidated, they may not be subdivided. 

VARIANCES 

The Architectural Committee and Board of Directors may grant variances.

Limitation on Liability

 

The AC and the members thereof, as well as any representatives of the Board designated to act on its behalf, shall not be liable for damages to any person submitting requests for approval or for failure to approve or disapprove in regards to any matter within its jurisdiction under the Covenants and Bylaws. 

Neither the AC nor the Association, its employees, agents or appointees, shall be responsible in any way for any plans or specifications submitted, revised, or approved in accordance with the foregoing provisions, nor for any structural, or other defects in work done according to such plans and specifications, nor for errors in the on-site location of any construction.  The AC shall not be responsible or liable for reviewing plans and specifications for engineering or structural soundness or compliance with any applicable governmental regulations.  Any deficiencies or failures of water runoff or drainage plans or designs are not the responsibility of the AC; such responsibility shall fall with the property owner. 

 

APPLICATION PROCESS AND REQUIRED PLANS 

The AC meets the second Saturday of each month at 9:00 AM at a designated meeting place.  All applications, plans and fees must be to the ZHA office one week prior to the AC meeting date.   

Two sets of plans, along with a completed application and paid fees, are required prior to scheduling a meeting with the AC.  Please call the ZHA office to obtain forms, covenants, architectural requirements and guidelines, and to obtain AC meeting dates and times.  To schedule an application review, please call the ZHA administrator. 

Minimum Plan Requirements: 

Site plan:  minimum 1” (inch = 20’ (feet) scale:

  1. Title area with owner’s name, unit, block and lot numbers, scale used and north arrow
  2. Lot lines, setback lines and easement lines, adjacent streets
  3. Existing natural features, significant trees, drainages and waterways with distances to proposed improvements
  4. Proposed structures and existing structures to include decks, walls and fences with dimensions to property lines
  5. Driveway and parking areas
  6. Power lines and pole placement
  7. Culverts

 

Floor Plans:

Indicate all rooms, walls, windows, and features, which affect the exterior of the proposed structure along with exterior dimensions. 

Elevations:

Elevations or exterior views of all major building facades are to be labeled with their orientation north, south, east, west; note walls, roofs, floor levels, finished grade and height of ridgelines from finished grade; note roof and wall materials and colors. 

Fence and Walls:

Locate on the site plan all fences and walls.  Solid or non-wire fences and walls should show an elevation view showing height, material and color. 

Site Sanitation:

Applications for new construction must indicate the proposed method for disposing of human waste on site prior to the connection of permanent toilet facilities. Typically this is a portable commercial toilet or temporary hook up to a septic system.  No pit toilets or outhouses are allowed. 

 

APPLICATION FLOW CHART 

  1. Obtain application forms for construction from the ZHA office.  Choose the appropriate application form for your construction and complete the form along with your building plans.
  2. Submit your application and plans to the ZHA office for consideration.
  3. Attend, or have representative attend, the AC meeting at which your plans are considered.  At this meeting, your plans will either meet conceptual approval or denial.  A site visit usually within 30 days will be scheduled after which you will receive final approval.
  4. Arrange for a site visit.  Site must be flagged.  AC is not responsible for, and cannot guarantee, lot lines.  A $50 fee will be imposed if the applicant or his/her representative does not show up for the site inspection or if the required items in the staking schedule are not staked.
  5. Obtain a written letter of approval from the AC, which is sent to the Alamosa County building inspector.  (The County approves no building permits without prior approval by the Zapata AC).
  6. Apply for a building permit from Alamosa County.
  7. Upon receipt of a building permit, proceed with your construction.  We will require substantial completion with 24 months of start of construction.
  8. Call for a final inspection.

 

NOTE:  You must have a residential well permit prior to the site inspection.

 

ZHA BUILDING APPLICATION

FORM A 

Form A is for new construction to include single-family dwellings, carports, garages, servants’ quarters, guesthouses and outbuildings in addition to remodeling or reconstruction.                                                                                           FEE:  $250 

  1. Applicant’s name  ________________________________________________

 

                 Address             _______________________________________________

 

                                            _______________________________________________ 

            Phone number         _______________________________________________ 

            Email:                     _______________________________________________ 

  1. Legal description/address where building/construction will be located.

 

    UNIT____________ BLOCK____________ LOT/TRACT____________ 

    ADDRESS___________________________________________________

  1. Is applicant aware of, and willing to abide by, the protective covenants, bylaws and architectural requirements and guidelines of the ZHA?  YES_______ NO_______
  2. Plans.  Attach site plan, floor plans and elevations to this application.
  3. Square feet of livable area.  _____________________ Sq. ft.
  4. Number of levels (1)______________ (2)______________ (2 ½)_____________
  5. Exterior Materials

    Roof materials____________________________Roof color_________________ 

    Wall materials____________________________Wall color_________________

  1. Number of 4”+ diameter trees to be removed_________________________
  2. Number of power poles to reach the dwelling_________________________
  3. Exterior lighting

    Attached to Buildings:  Number of______Description__________________

    Walkway lighting:  Number of__________Description_________________

  1. Construction start date_____________Construction completion date___________

 

    Applicant’s signature: ______________________________________Date_________ 

    Required attachments:  Site and floor plans, elevations of all proposed buildings.

 

ZHA BUILDING APPLICATION

FORM B 

Form B is for driveways, well, septic and leach field, power lines. 

                                                                                                                FEE:  $250

  1. Applicant’s name_________________________________________

 

                Address            _________________________________________ 

                                         _________________________________________ 

             Phone number     _________________________________________ 

             Email:                  _________________________________________ 

  1. Legal description/address where building/construction will be located.

 

    UNIT_____________BLOCK_____________LOT/TRACT____________ 

    ADDRESS____________________________________________________ 

  1. Is applicant aware of, and willing to abide by, the protective covenants, bylaws and architectural requirements and guidelines of the ZHA?  YES_______NO_______
  2. Acceptance and payment for this application does not guarantee approval of residential construction plans in the future.  You have 5 years from the date of this application to receive approval for and begin construction without incurring an additional residential application fee.  No camping, campers, trailers or recreational vehicles are allowed as occupied dwellings per existing covenants.
  3. Plans.  Attach site plan to this application.
  4. Number of 4” (inches) + diameter trees to be removed____________________
  5. Number of power poles to reach the dwelling___________________________

 

Applicant’s signature:  ___________________________________________________ 

Date:  _________________________ 

Required attachments:  Site plan showing drives, parking areas, well, septic, leach field, and power line/pole placement.

 

ZHA BUILDING APPLICATION

FORM C 

Form C is for carports, garages, outbuildings, fences or walls, re-drilling of a well or re-installation of a septic and/or leach field.                                               FEE:  NONE 

1.  Applicant’s name  ______________________________________________________

 

            Address           _____________________________________________________ 

                                    ______________________________________________________ 

         Phone number    _____________________________________________________ 

          Email:                _____________________________________________________

  1. Legal description/address where building/construction will be located.

 

    UNIT__________BLOCK__________LOT/TRACT__________ 

    ADDRESS__________________________________________________________

  1. Is applicant aware of, and willing to abide by, the protective covenants, bylaws and architectural requirements and guidelines of the ZHA?  YES_______NO_______
  2. Plans.  Attach site plan, floor plan and elevations to this application.
  3. Square feet of building:  __________________sq. ft.
  4. Number of Levels (1)___________________(1 ½)______________________
  5. Exterior Materials

    Roof materials___________________________Roof color____________________

    Wall materials___________________________Wall color____________________

  1. Number of 4” + diameter trees to be removed______________________________
  2. Number of power poles to reach the building_______________________________
  3. Exterior lighting

    Attached to Buildings:  Number of______Description________________________

    Walkway lighting:  Number of__________Description_______________________ 

Applicant’s signature:  _____________________________________________________ 

Date:  _________________________ 

Required attachments:  Site plan showing existing structures, drives, parking, power lines, septic and leach fields and floor plans, elevations of all proposed building, fences or walls.

 

ZHA BUILDING APPLICATION

FORM D 

Form D is for variances                                                                              FEE:  NONE 

1.  Applicant’s name  ______________________________________________________

 

        Address               _____________________________________________________ 

                                    ______________________________________________________ 

        Phone number     _____________________________________________________ 

        Email:                  _____________________________________________________ 

  1. Legal description/address where building/construction will be located.

 

    UNIT__________BLOCK__________LOT/TRACT__________ 

    ADDRESS___________________________________________________________

  1. Is applicant aware of, and willing to abide by, the protective covenants, bylaws and architectural requirements and guidelines of the ZHA?  YES_____NO_____
  2. Requested variance:  Attach request to this form for AC review.  Be as detailed as possible.

 
 
 
 
 
 
 

Applicant’s signature:  ____________________________________________________ 

Date:  _________________________________

                                                                      

 

    ZHA EASY FORM APPLICATION

FORM E 

Form E is for small projects not covered by the other application forms. FEE: NONE 

1. Applicant’s Name:__________________________________________________

      Address:__________________________________________________________

      Phone Number:____________________________________________________

      Email:____________________________________________________________ 

2. Legal description/address where building/construction will be located:

      UNIT  ____________  BLOCK  ____________  LOT/TRACT  ____________

      ADDRESS_______________________________________________________ 

3. Is the applicant aware of, and willing to abide by, the protective covenants, bylaws and architectural requirements and guidelines of the ZHA? YES  ________  NO  __________ 

4. Explain what you want to do:  
 
 
 
 
 
 
 
 

Applicant’s Signature:  ______________________________________Date: _________

 

    ON SITE INSPECTION CHECK LIST 

    Prior to the on-site inspection, please have the following completed and ready for inspection – 

    ____1. Install a permanent address sign

    ____2. Stake and label the property boundaries

    ____3. Stake and label the septic tank and leach field perimeters. (The leach field

                must be a minimum of 50' away from any watercourses, lake or free-   flowing ditch.)

    ____4. Stake and label where the driveway access is located from the roadway.

    ____5. Stake and label the well. (Must be a minimum of 100' from the leach

          field.)

  •  

      ____6. Stake and label the dwelling corners and any other structure or outbuilding.

    ____7. Place a ribbon around any trees 4" (inches) in diameter or larger that will

          be removed.

    ____8. Stake and label power poles. 
 
 

         Any site that is not ready for inspection as above, will be assessed a $50 inspection fee. 

 

     

    UTILITIES AND PERMITS 

    COUNTY BUILDING PERMITS (Also well and septic)

    Alamosa County Building Inspection

    702 4th Street

    PO Box 178

    Alamosa, CO  81101

    (719) 589-3812 

    STATE ELECTRICAL PERMITS

    Colorado State Examining Board of Electricians

    1580 Logan St., Suite 550

    Denver, CO  80203-2300

    (303) 894-2300

    Local Office:  226 6th St., Alamosa, CO  81101  (719) 589-3010 

    STATE PLUMBING PERMITS

    Colorado State Examining Board of Plumbers

    1580 Logan St., Suite 550

    Denver, CO  80203-2300

    (303) 894-2300

    Local Office:  226 6th St., Alamosa, CO  81101 (719) 589-3010 

    STATE WELL PERMITS

    State Division of Water Resources

    422 4th Street

    Alamosa, CO  81101

    (719) 589-6683 

    ELECTRICITY

    San Luis Valley Rural Electric Cooperative (SLVREC)

    3625 West Highway 160

    Monte Vista, CO  81144

    (719) 852-3538 

    TELEPHONE

    Columbine Telecom Company

    5998 North Highway 17

    Mosca, CO  81146

    (719) 378-2231

 

Your browser may not support display of this image.